Industrial sites

Other

Building area

587,30 m2

Total area

638 m2

Usable area

542 m2

Cubic volume

3.325 m3

Collectors with a cross-section of 300 mm

6.000 mb

Cubic volume

123.740,40 m3

Usable area

16.335,10 m2

Cubic volume

6.086 m3

Usable area

1.141,12 m2

Activated sludge thickening station for excess sludge:

Cubic volume

572 m3

Building area

143 m2

Pumping station for filtrate water:

Cubic volume

19,4 m3

Building area

5,3 m2

Pumping station for filtrate water and leachate:

Cubic volume

25,7 m3

Building area

5,3 m2

Predenitrification chamber:

Cubic volume

2,080 m3

Building area

334,5 m2

  • separation in the cubic capacity of the existing denitrification chambers of additional defossification chambers, together with the provision of new technological equipment,
  • separation in the volume of the existing aeration chambers of an additional alternate zone equipped with medium-speed agitators,
  • installation of a new fine-bubble aeration system in the biological reactors and new recirculation pumps together with a piping system,
  • installation of a new blower in the blower station,
  • installation of a new sludge scraper in the secondary settling tank together with a floating debris removal system.

Pumping station building:

Cubic volume

986 m3

Underground section:

Cubic volume

1.475 m3

Access road:

Area

568 m2

Construction of a water intake, intake canal, power station block with outlet, outlet canal and upgrading of the water level with fish ladder

Capacity

2.900 m3 / daily

Overall length

12 m

Spread

11,35 m

Execution of earthworks, excavations, reinforced concrete foundations for the hall construction (foundation floors, ground beams), backfilling of foundations with compaction, execution of foundation layer for hall floors (lean concrete)

Cubic volume

38.500 m3

Usable area

4.860 m2

Hardened surfaces

1.958,40 m2

Total area

3.300 m2

Area

6.000 m2

Cubic structures (pavilions, restaurants, car washes):

Area

2.470 m2

Cubic volume

7.700 m3

Plastic sewage networks approx. 10,000 m

Utility relocations, new and replacement pavements approx. 30,000 m²

Osadnik z osadem czynnym, osadnik wtórny:

powierzchnia

18.72 m2

płyta fundamentowa

13.300,00 ml

Centralna maszynownia:

powierzchnia

1.180 m2

płyta fundamentowa

830 ml

Kanał mediów i klatka schodowa:

powierzchnia

1.400 m2

Production capacity of 24 million ceramic units

Production capacity of 32 million ceramic units

Total area

2.200 m2

  • Complete plants:
    • rubber,
    • polystyrene
    • styrene,
    • polymers,
    • catalysts,
    • polystyrene beads.
  • Modernisation
    • Carbide and Acetylene Plant,
    • Butanol and Octanol Division,
    • Aldehyde and Acetic Acid Division,
    • Chloropropane Plant,
    • Combined Heat and Power Plant I,
    • Power Plant, Mechanical Plant, Measurement Plant,
    • Railway Transport Department.